The project consists in a cable stayed bridge with a total length of 465,80 m, sited in the commercial harbour of Venice-Marghera inside the industrial area, on the west industrial stream. Also the connection roads to the existing traffic systems have been designed; construction supervision and health and safety coordination for the whole project have been performed.