Architectural and Structural Design of Modern Art Museum and Pedestrian Bridge in Sarajevo (Bosnia Herzegovina)Cable Stayed Bridge Construction 2001 - ongoing Genova Marina Expansion 2003 Underwater Harbour Crossing 2003 Voltri Container Terminal 1999 - 2005 Calata Bettolo Container Terminal - Italy 2003 - 2005 Lyon-Turin New High Speed Railway Link- Italy 2005 - 2006 Access Road System to the Milan Fair - Italy 2005 - ongoing New Spezia-Sebastopoli underpass in Turin Cable stayed bridge on the west industrial stream of the commercial harbour of Venice-Marghera Genoa Metro Railway New Venice “Marco Polo” Airport New Wastewater Treatment Plant in Nosedo - Milan

The project consists in a cable stayed bridge with a total length of 465,80 m, sited in the commercial harbour of Venice-Marghera inside the industrial area, on the west industrial stream. Also the connection roads to the existing traffic systems have been designed; construction supervision and health and safety coordination for the whole project have been performed.

introduction . team . skills . key project . contact
buildings | environment | infrastructures | energy