Architectural and Structural Design of Modern Art Museum and Pedestrian Bridge in Sarajevo (Bosnia Herzegovina)Cable Stayed Bridge Construction 2001 - ongoing Genova Marina Expansion 2003 Underwater Harbour Crossing 2003 Voltri Container Terminal 1999 - 2005 Calata Bettolo Container Terminal - Italy 2003 - 2005 Lyon-Turin New High Speed Railway Link- Italy 2005 - 2006 Access Road System to the Milan Fair - Italy 2005 - ongoing New Spezia-Sebastopoli underpass in Turin Cable stayed bridge on the west industrial stream of the commercial harbour of Venice-Marghera Genoa Metro Railway New Venice “Marco Polo” Airport New Wastewater Treatment Plant in Nosedo - Milan

In order to develop the preliminary design of the Genoa Harbour Submarine Tunnel Preliminary Design, an inter-disciplinary team was formed to analyze all technical, transport and environmental issues leading to the selection of the best tunnel solution. The project included the design of the connections to the city road system, two twin bored tunnels, an underground parking, the relocation of the naval repair industry and surface roads.

introduction . team . skills . key project . contact
buildings | environment | infrastructures | energy