Architectural and Structural Design of Modern Art Museum and Pedestrian Bridge in Sarajevo (Bosnia Herzegovina) Cable Stayed Bridge Construction 2001 - ongoing Genova Marina Expansion 2003 Underwater Harbour Crossing 2003 Voltri Container Terminal 1999 - 2005 Calata Bettolo Container Terminal - Italy 2003 - 2005 Lyon-Turin New High Speed Railway Link- Italy 2005 - 2006 Access Road System to the Milan Fair - Italy 2005 - ongoing New Spezia-Sebastopoli underpass in Turin Cable stayed bridge on the west industrial stream of the commercial harbour of Venice-Marghera Genoa Metro Railway New Venice “Marco Polo” Airport New Wastewater Treatment Plant in Nosedo - Milan

The Voltri Container Terminal was completed in 2005 with the construction of the 6th operating module. The land reclamation for the module covers an area of 125,000 m2 and was constructed using dredged sediments. The geotechnical design of the reclamation and of the crane pile foundations as well as the construction works supervision were provided.

introduction . team . skills . key project . contact
buildings | environment | infrastructures | energy