The Voltri Container Terminal was completed in 2005 with the construction of the 6th operating module. The land reclamation for the module covers an area of 125,000 m2 and was constructed using dredged sediments. The geotechnical design of the reclamation and of the crane pile foundations as well as the construction works supervision were provided.